The 45-minute pre-inspection checklist.
Four pages. Unit, inside the building and outside on the site, in walking order. Every line tagged by severity so you fix the 24-hour items first.


Built around how inspectors actually walk.
Fix in 24 hours
Smoke and CO alarms, exposed wiring, blocked exits, unvented fuel heaters, dryer ducts.
Fix in 30 days
No GFCI near water, entry door that won't lock, loose handrails, capped water heater relief pipe.
Fix in 30 days
Damaged cabinets, missing light fixtures, minor leaks, damaged floor covering.
Log and plan
Cosmetic items to track for turnover. Ask your PHA how it treats them.
Examples are typical. Your inspector assigns the final severity using HUD's NSPIRE standards.
Sources: HUD NSPIRE HCV/PBV Inspection Checklist; 24 CFR 982.404.
Bring these five things
Pass the first time.
Walk your unit in 45 minutes, fix what fails, and keep your HAP payments on schedule.