
Pass the first time.
Voucher inspections are changing. HUD's new NSPIRE-V standard replaces HQS by February 1, 2027, and items that passed before can fail now. Walk your unit in 45 minutes and protect your HAP payments.
It passed under HQS. It can fail under NSPIRE-V.
Nothing has to be broken. Under NSPIRE-V, a missing safety item is a fail on its own, and the clock starts when you are notified.
Since December 29, 2024, smoke alarms in voucher units must be hardwired or use a sealed 10-year battery and follow NFPA 72 placement. CO alarm requirements have applied to voucher units since December 27, 2022.
Sources: HUD NSPIRE Smoke Alarm standard; HUD NSPIRE Carbon Monoxide Alarm standard; HUD Notice PIH 2026-18.
- 24 hrsSmoke alarm with a removable 9-volt battery
Replace with hardwired or sealed 10-year model - 24 hrsNo CO alarm with a gas furnace or attached garage
Required where the CO standard applies - 30 daysStandard outlet next to the kitchen sink
GFCI protection within 6 feet of a water source - 30 daysWater heater relief valve capped or not piped
Pipe slopes down and ends 2 to 6 inches above the floor - 24 hrsUnvented gas or kerosene space heater in the unit
Remove it; provide safe permanent heat
Severity shown is typical. Your inspector and your PHA's Administrative Plan make the final call.
A $300 repair, or a month of HAP?
If a deficiency is not fixed by the deadline, the PHA must abate the housing assistance payment. Abated payments are not repaid, even after the fix. Move the sliders to see your numbers.
Estimate only, prorated by day. Your PHA's Administrative Plan sets when abatement starts. Under 24 CFR 982.404, the HAP contract is terminated if the unit is still not fixed 60 days after the abatement notice, or a longer period your PHA sets. The Landlord Kit's Repair Cost Estimator prices 72 common fail items.
Sources: 24 CFR 982.404.
Each housing authority picks its own date, on or before Feb 1, 2027.
Some switch on January 1. Find yours, see what it has published for owners, and how many days you have.
Renton Housing Authority
Renton, WAJohnston County Housing Assistance Payments Program (HAPP)
Smithfield area, NCBoulder Housing Partners
Boulder, COHousing Authority of the City of Santa Barbara
Santa Barbara, CAASPIRE (formerly the Housing Authority of Winston-Salem)
Winston-Salem, NCSources: HUD Notice PIH 2026-18; Federal Register, Sept. 30, 2025.
See what fails, and what fixed looks like.
Drag the handle. Each pair shows a common fail item and the fix an inspector expects to see.
FailPassIllustrative, AI-generated
Kitchen outlet near the sink
Fail: a standard outlet within 6 feet of the sink, no GFCI protection, cracked cover plate.
Pass: a GFCI outlet that trips and resets with a tester, intact cover plate.
Typical fix: about a $20 part, or $130 to $300 with an electrician (Angi).
Your local prices will vary. The kit's estimator lets you enter your own.
See all 5 pairsEverything you need to walk, fix and document.
Quick-Start Guide
34 pages in plain English: what changed, the automatic-fail list, room-by-room walkthrough, alarms, fail reports and protecting your HAP.
45-minute checklist
Walk the unit, inside and outside in order. Every line is tagged Life-Threatening, Severe, Moderate or Low. Printable and fillable.
Repair tracker and cost estimator
Deadlines calculate from the notice date. Price 72 common fail items and see the HAP at risk if you wait.
Letters and templates
Tenant prep notice, access notice, re-inspection request, extension request and contractor quote request.
Inspection tour video
A narrated walk through the major areas NSPIRE-V covers: unit, inside the building and outside on the site.
AI prompt pack
Turn a fail report into a repair plan, write a plain-language tenant notice, or draft a handyman scope of work.
NSPIRE-V in 60 seconds.
What changes, why the clock matters, and what the kit covers.

Start with the 45-minute checklist.
The same checklist that ships in the kit. Print it, grab an outlet tester and a flashlight, and walk your unit this weekend.
Straight answers.
Is this from HUD or my housing authority?
No. This is an independent educational resource built from HUD's published standards and notices. It is not affiliated with or endorsed by HUD or any housing authority. Always confirm rules with your PHA.
Do I lose my voucher if I fail?
Landlords don't hold vouchers; your tenant does. Your risk is the housing assistance payment (HAP). If a failed item isn't fixed on time, the PHA must abate HAP, and if it's still not fixed, the HAP contract is terminated. You also may not evict a tenant because HAP was abated.
Sources: 24 CFR 982.404.
When does my PHA switch?
Each PHA sets its own date, no later than February 1, 2027. HUD asked PHAs to report their transition dates and to notify owners and families. Check the list or call your PHA's landlord line.
Sources: HUD Notice PIH 2026-18.
Does the kit guarantee I'll pass?
No one can promise that. Your inspector decides. The kit helps you find and fix the common fail items before inspection day, and you have a 30-day money-back guarantee.
Pass the first time.
Walk your unit in 45 minutes, fix what fails, and keep your HAP payments on schedule.